The D365 Firming Flaw That Makes On-Time Delivery Impossible
Why D365 Production Orders Stop Trying to Hit Your Customer's Delivery Date Your planning team is doing everything right. They're running the schedule, watching the dates, flagging orders that are at risk. When an order looks tight, they escalate. Overtime gets approved. The floor works the weekend. The order ships, and it's still late. The customer calls. Nobody saw it coming. This is not a planning failure. It's not a capacity problem. The team was working as hard as they c
Kerry Kennedy
Apr 174 min read


Why Does D365 Finite Capacity Planning Show Gaps in the Production Schedule?
Why Does D365 Finite Capacity Planning Show Gaps in the Production Schedule? When planners see a production schedule full of gaps, with operations floating in time and unexplained space between them, the first reaction is usually the same: something is wrong with the setup. Implementation partners often reach the same conclusion, and because they don't work on the shop floor, they may accept the gaps as a capacity constraint and move on. A planner with floor experience knows
Kerry Kennedy, MBA
Mar 274 min read
bottom of page